The Compact Implementation Technical Team (CITT) is the entity established by the Confederated Salish and Kootenai Tribes (CSKT)-Montana Compact (Compact) to plan and advise the Project Operator on the implementation of the Flathead Indian Irrigation Project (FIIP) Operational Improvements, Rehabilitation and Betterment, and Adaptive Management. The CITT duties and responsibilities are defined in more detail in Appendix 3.5 to the Compact.
The initial focus of the CITT is to develop recommendation to CSKT, Montana, and the United States (Compact Parties) on the use of available funding for water measurement, a stock-water program, and an on-farm efficiency program. Some of the CITT functions identified in the Compact will need Federal Congressional and Tribal approval to be effective. The Compact Parties are currently authorized to participate in the CITT for those functions where additional Congressional and Tribal approval is not required.
Appendix 3.5 of the Compact states that each Compact Party and the Project Operator shall assign a technical team member to the CITT; FIIP irrigators may also assign an irrigator to the CITT.
CITT Members
First Name | Last Name | Title | Organization |
Eric | Bruguier | Project Operator | BIA |
David | Lake | Irrigator Representative | |
Casey | Ryan | Compact Resource Officer | CSKT Natural Resources Dept. |
Maya | Rao | Hydrologist | MT DNRC, Water Resources Div. |
Daniel | Lozar | Irrigation Engineer | BIA |
CITT Meetings and Events
CITT Meeting Details: December 11, 2023
1:00 pm to 5:00 pm
Location: Virtual Meeting via Zoom
Link: https://cskt.zoom.us/j/98537745304?pwd=VURvV28xWFBKUnNPMGpobHFtVnMrUT09
Passcode: 574881
CITT Meeting Details: October 3, 2023
9:30 am to 12:30 pm
Location: Mission Valley Power Conference Room, 36079 Pablo West Road, Pablo, MT
CITT Meeting Details: June 1, 2023
9:30 am to 12:30 pm
Location: Sherri McDonald Hospitality Room (Joe McDonald Gymnasium), SKT College
58138 US-93, Pablo, MT 59855
CITT Meeting Details: April 19, 2023
9:30 am to 12:30 pm
Location: Mission Valley Power Conference Room, 36079 Pablo West Road, Pablo, MT 59855
CITT Meeting Details: April 14, 2021 from 9:30 am to 1:00 pm
Location: Meeting held remotely via Zoom Webinar
Meeting Materials:
AgriMet Weather Station Funding Change
Reservoir Monitoring Project Installation Plan - Phases II & III
FIIP Bathymetry Project Completion Memorandum
Scope of Work - Task Order 4 - AgiMet Annual Operation and Maintenance Funding
CITT Meeting Details: January 17, 2019 @ 9:30 am – 1:00 pm
Location: Mission Valley Power Conference Room, 36079 Pablo West Road, Pablo, MT
Meeting Materials:
Agenda
Summary
Audio
CITT - Flume Construction Recommendation
CITT Meeting Details: January 30, 2018 @ 9:30 am – 1:00 pm
Location: Mission Valley Power Conference Room, 36079 Pablo West Road, Pablo, MT
Meeting Materials:
Agenda
Summary
Audio
CITT Recommendation for AgiMet Funding DRAFT (2017-12-12)
Bathymetry Consideratioin DRAFT (2018-01-04)
CITT Meeting Details: June 21, 2017 @ 9:30 am – 12:00 pm
Location: Mission Valley Power Conference Room, 36079 Pablo West Road, Pablo, MT
Meeting Materials:
Agenda
Summary
Audio
DRAFT AgiMet Recommendation (2017-06-08)
CITT Meeting Details: January 24, 2017 @ 10:00 am – 1:00 pm.
Location: Mission Valley Power Conference Room, 36079 Pablo West Road, Pablo, MT
Meeting Materials:
Agenda
Summary
Audio
Photos of Moving Pump Intakes Out of FIIP Canal
CITT Meeting Details: May 24, 2016 @ 9:30 am – 12:30 pm.
Location: Mission Valley Power Conference Room, 36079 Pablo West Road, Pablo, MT
Meeting Materials:
Agenda
Summary
Audio
Draft Scope of Work for Water Measurement (2016-04-18)
CITT Documents
Task Order 3 - Flume Design - January 2018
Task Order 3 to the State - CSKT Master Agreement provides funding for the engineering design of hydraulic measurement structures at twelve distinct irrigation diversion on the FIIP, each of which is identified as a River Diversion Allowance (RDA) location in the Compact.
Task Order 1 - Water Measurement Year 1 of 10 - October 2016
Task Order 1 to the State - CSKT Master Agreement provides funding for the first year of the CITT approved Workplan for Water Measurement at Instream Flow, River Diversion Allowance and Natural Flow and Irrigation Return Flow Locations.
State - CSKT Master Agreement - October 2016
Cooperative agreement between the State of Montana and Confederated Salish and Kootenai Tribes of the Flathead Indian Reservation.
Flathead Indian Irrigation Project Modernization Plan - April 2016
The Bureau of Indian Affairs (BIA), in cooperation with world-renowned irrigation experts from the Irrigation Training and Research Center at Cal Poly University (ITRC), recently conducted a modernization study for the Flathead Indian Irrigation Project (FIIP). The results of that work are presented here and can be downloaded via the links below. While not a product of the CITT, this report will augment existing technical work related to the FIIP and will inform FIIP project operators, FIIP irrigators, the CITT, and decision makers as they consider implementing improvements to the FIIP.
FIIP Modernization Plan (complete) (112 MB)
Cover and Table of Contents
Section 1 - Project Overview
Section 2 - Camas Canal Unit Modernization (12 MB)
Section 3 - Placid Canal and Jocko River Modernization (5 MB)
Section 4 - Jocko Canal Unit Modernization (11 MB)
Section 5 - Lower J and Revais Canal Modernization (4 MB)
Section 6 - Mission Canal Unit Modernization (14 MB)
Section 7 - Mission H Canal Modernization (4 MB)
Section 8 - Crow Creeks, Kicking Horse, and Ninepipes Reservoir Modernization (9.5 MB)
Section 9 - Post Canal Unit Modernization (13 MB)
Section 10 - Moiese Canal System Modernization (7.6 MB)
Section 11 - Pablo Feeder Canal Modernization Near Polson (9.3 MB)
Section 12 - Valley View Modernization (8.8 MB)
Section 13 - Modernization near Horte Reservoir (12 MB)
Section 14 - SCADA (7.5 MB)
Section 15 - On-Farm Irrigation
Scope of Work for Water Measurement
Scope of Work: CITT Workplan for Water Measurement at Instream Flow, River Diversion Allowance, Natural Flow and Irrigation Return Flow Locations. Approved by CITT on May 24, 2016.
CITT Operating Rules
Compact Implementation Technical Team Operating Rules - Adopted March 15, 2016.