Delphia Canal Inverted Siphon (2012) Delphia-Melstone Water Users Association (DMWUA)
Delphia-Melstone Water Users Association History
|
|
Project History In 2011, the Musselshell River experienced a significant flooding event, which damaged numerous ditches and irrigation structures operated by the DMWUA. Of these damaged structures, the largest and most technically challenging, the Delphia Canal Long Span Pipe over the Musselshell River, was put on hold for repairs until 2012, so funding and proper design could be established. The damage to the Long-Span Pipe included pier damage, pipe failure and outlet transition structure loss. |
|
Work Breakdown
|