Augusta 2958 24-11 5B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,713’ MD/10,390’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Bear Canyon Fuels Reduction Project 2026-09-16
Closing Date:
10-24-2026
Noncommercial fuels reduction on 25 acres of state land. Trees that are 8” or less in diameter would be thinned to a crown spacing of 10-15’. Trees over 8” diameter would not be cut. Other dense brush or shrubs located within the treatment units will be thinned or removed. All slash generated from this project would be hand piled and burned during appropriate, snow covered conditions.
Category:Forest Practices
|
Forest Practices | ${date} |
|
Bridger Pipeline LLC, pipeline maintenance 2026-09-21
Closing Date:
10-30-2026
Bridger Pipeline, LLC has requested from the Department of Natural Resources and Conservation a Land Use License for the purpose of a temporary workspace for maintenance on an existing pipeline.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Chouteau County Gravel Test Pits 2026-09-14
Closing Date:
10-24-2026
Riverside Contracting has applied for an aggregate test permit on two tracts of land in Chouteau County. They are permitted to excavate holes between 3 and 20 feet to test for gravel resources present. Proponent will be required to salvage and replace topsoil along with reseed disturbed areas.
Category:Coal, Oil, Gas, and Other Minerals
|
Coal, Oil, Gas, and Other Minerals | ${date} |
|
Chouteau County Gravel Test Pits 2026-09-17
Closing Date:
10-24-2026
Riverside Contracting has applied for a permit to test for aggregate resources on State Land in Chouteau County. Under this permit they will be allowed to dig test holes between 3 and 20 feet to look for gravel resources. the Proponent will salvage and replace topsoil and reseed disturbed areas with an approved seed mix.
Category:Coal, Oil, Gas, and Other Minerals
|
Coal, Oil, Gas, and Other Minerals | ${date} |
|
DNRC - City of Libby lower Flower Creek Dam staging area 2026-09-23
Closing Date:
10-30-2026
Due to severe flooding during December 2025, it has been identified that the lower Flower Creek reservoir dam and spillway have been compromised. To facilitate the repairs to the dam, additional parking and staging area need to be cleared of trees and a staging area of 0.38 acres constructed. This proposed staging area lies completely within the SMZ of Flower Creek.
While an Alternative Practice would typically be used to modify a silvicultural practice during a commercial logging activity, the intent of this proposal is to change the use of the land from a forested site to develop the site to support city infrastructure. This Alternative Practice would allow the operation of wheeled or tracked equipment in a streamside management zone, removal of all vegetation, both commercial and non-commercial, and allow the construction of a road and staging area within the SMZ. The proposed action would impact 0.38 acres of SMZ, both sides of approximately 175 lineal feet of a side channel and one side of approximately 75 feet of the main channel would be impacted. 48 commercial sized trees would need to be removed and would be sold. Stumps would be dug out and hauled away along with the slash. Clean fill would be hauled onto the site to build up the parking and staging area.
Category:Forest Practices
|
Forest Practices | ${date} |
|
Draggin Iron Ranch Waterline Project 2026-09-28
Closing Date:
Until Expired
Authorization of the installation and use and maintence of .39 miles of water pipeline
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Ex-Presidents 5-8-17-20-29 1H 2026-09-29
Closing Date:
11-07-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 36,688’ MD/10,086’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Ex-Presidents 5-8-17-20-29 2H 2026-09-29
Closing Date:
11-06-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 36,359’ MD/10,086’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Ex-Presidents 5-8-17-20-29 3H 2026-09-29
Closing Date:
11-06-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 36,295’ MD/10,086’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Ex-Presidents 5-8-17-20-29 4H 2026-09-29
Closing Date:
11-06-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 36,515’ MD/10,086’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Kona Bridge and Kelly Island stabilization Project 2026-09-03
Closing Date:
10-09-2026
Montana Fish, Wildlife and Parks is proposing stream stabilization work within the Navigable waterway at the Kona and Kelly island fishing access sites in Missoula County. Coldwater engineering is their authorized agent and prepared the joint application.
Kelly Island: A riprap toe would be installed within the low water mark for approximately 194 feet along the bank and would extend 6-10 feet into the stream (.04 acre).
Kona: A stone toe will be installed within the low water mark for approximately 150 feet along the bank and would extend up to 20 feet into the stream (.07 acre).
Both projects are part of a more extensive stream stabilization project. The portions outlined above are the only operations occurring within DNRC jurisdiction. All work would be completed during low flow. Both proposed areas combined would be less than an acre in size.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Land Use License - LUL 576-26_Layflat Hose 2026-09-08
Closing Date:
10-16-2026
On September 3, 2026, DNRC received an application from the Proponent, ASWS LLC dba
Hamlin Water, for the placement and operation of a temporary water pump and to lay a temporary
layflat hose for the purpose of transferring freshwater across State of Montana Land tracts. The
water would be utilized for the fracturing of a horizontal Bakken well(s).
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Layflat Hose 2026-09-25
Closing Date:
10-30-2026
This checklist EA evaluates the impacts of a land use license application to place layflat hose on a tract in Richland County, Montana for the purposes of moving freshwater for oil and gas operations.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Luke Mountain 2 Salvage Timber Sale EA 2026-08-12
Closing Date:
10-24-2026
The Anaconda Unit of the Montana Department of Natural Resources and Conservation (DNRC) is proposing the Luke Mountain 2 Salvage. The project is located seven miles west of Avon, MT.
Category:Trust Lands - Forest Management
|
Trust Lands - Forest Management | ${date} |
|
Mount Johns Timber Sale EA 2026-08-12
Closing Date:
10-24-2026
The Kalispell Unit of the Montana Department of Natural Resources and Conservation (DNRC) is proposing the Mount Johns Timber Sale. The project is located 5 miles south of Lakeside, MT.
Category:Trust Lands - Forest Management
|
Trust Lands - Forest Management | ${date} |
|
Norgaard 6-30-1H 2026-09-29
Closing Date:
11-06-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 26,382’ MD/10,333’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Norgaard 7-19-4H 2026-09-29
Closing Date:
11-06-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 26,450’ MD/10,333’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Norgaard 7-19-5H 2026-09-29
Closing Date:
11-06-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 26,119’ MD/10,333’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Norgaard 7-19-6H 2026-09-29
Closing Date:
11-06-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 26,559’ MD/10,333’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Pinehurst 2958 24-11 2B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,418’ MD/10,370’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Pinehurst 2958 24-11 3B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,345’ MD/10,347’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Pinehurst 2958 24-11 4B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,497’ MD/10,325’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Pinehurst 2958 24-11 5B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,881’ MD/10,308’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Programmatic Environmental Draft Analysis_Non-Mechanized Mineral Exploration Land Use License 2026-09-22
Closing Date:
10-26-2026
Draft Programmatic Environmental Analysis - Non-Mechanized Mineral Exploration Land Use License on State of Montana Trust Lands: The Montana Department of Natural Resources has published a scoping notice for non-mechanized mineral exploration via a Land Use License (LUL) on State of Montana Trust Lands. The Department is seeking public comments regarding a proposed Programmatic Environmental Analysis.
The Department will be accepting comments until 5 pm, November 9, 2026. You may comment using the following link: https://forms.cloud.microsoft/Pages/ResponsePage.aspx?id=mEypBw_zu0q9ftY_hyDcAq0XwF1pSAVHijSM3Fjdj0ZUMVZYTjdXVlA5NTFEMlkyUkNYWlBRTDVBUy4u
Category:Coal, Oil, Gas, and Other Minerals
|