Vincent Alternative Practice 2023-07-27

Closing Date: 08-27-2023
Chas Vincent is requesting to place a skid trail within the 100-foot SMZ of a Class 1 stream. This would allow access to a portion of the unit that would otherwise be inaccessible. The building of the skid trail would also result in some sub-merchantable trees being damaged or removed. A slash filter windrow would be put in place to minimize the chance of any material rolling into stream. Any material deposited in stream would be removed immediately. Grass seeding would occur after harvest activities to stabilize soil.

Tags