Travis Reum Spring Rehabilitation 2023-11-21

Closing Date: 12-22-2023
Travis Reum has proposed rehabilitating a spring that has silted in and installing a new pipeline to existing tanks. A pipeline and collection site were established approximately 20 years ago through a partnership with Beaver Creek Park. This project would install a spring box at the collection site and replace the old pipeline with the plan to utilize the old pipeline route to minimize impact to the area. The pipeline will go to two existing stock tanks, one being on state trust land and the other on county land. It is not anticipated that either tank will need to be relocated. This EA will be addressing the new pipeline and spring box on trust lands.

Tags