Poly Produced Water line to accompany Glacier Peak Crude Oil Pipeline 2025-10-312025-10-31
Closing Date: 12-03-2025
Attached is the Memo that has been filed that this LUL has been considered as a concurrent with the Easement for Glacier Peak Crude Oil Pipeline, which was approved by the land board last week. The memo increases the right of way from 35' to 50' to accommodate this LUL for the produced water line.