Park County Telecommunications Fiber Optic Installation 2024-10-04
Closing Date: 11-04-2024
An easement is proposed for a buried telecommunication cable in the existing Highway 89 Right of Way (ROW). This will allow connection to and between existing facilities in White Sulfur Springs and Big Timber, MT. The installation would offer improved future growth capabilities. If approved, cable would be installed along the proposed route utilizing existing ROW corridors and as closely as possible to existing facilities as is practical. A map is attached to clarify location.