NW Energy Teton River Powerline Extension 2024-02-12
Closing Date: 03-15-2024
Northwestern Energy has submitted an application to extend an overhead 12,470 volt distribution powerline to serve a customer’s property located on the North side of the Teton River. Project to consist of a total of four new single construction poles and no guy anchors. All the newly proposed poles to be installed on customer property. The span of wire between the second and third pole to cross the Teton River. The project does not cross State Trust Lands, and there will be no disturbance to the Teton River bed, just the wires overhead.