Mid-Rivers Telephone Cooperative Fiber Optic Line 2025-08-08

Closing Date: 09-12-2025
The Town of Jordan (Henceforth referred to as proponent) has requested a permanent easement for the construction and operation of an overhead powerline easement upon the above-referenced state tract, which will be developed and operated by McCone Electric. The powerline will power the electric pump that will pump effluent from existing sewage lagoons to a newer facility.

Tags