MR, Toole County, (Power) Utility ROW 2024-01-26

Closing Date: 02-26-2024
Marias River Electric Cooperative (Marias River Electric) proposes to install an overhead powerline located on state land. The proposed easement route is located parallel to the Oilmont Highway. The project will require installation of 19 power poles and encumber 3.64 acres.

Tags