Lovec Pipeline Extension 2024-05-08
Closing Date: 06-08-2024
The proponent has requested placing and maintaining a stock water pipeline upon state owned T2N-R60E-Sec 36. The pipeline will stem from an existing well located on the same section. This pipeline would be installed using the rip trench method and be approximately .5 miles in length. This pipeline should create more reliable water sources for livestock and wildlife, while creating better grazing distribution within the scope of the project. The project would include installing one additional stock tank in the N1/2 of section 36.