Glacier Peak Pipeline Project 2023-07-24

Closing Date: 08-25-2023
Glacier Peak Midstream LLC (Henceforth referred to as proponent) has requested a temporary land use license and right of way easement to cross state trust land owned tracts located T26N-R59E-Sec 36 with an 8” steel, crude oil pipeline, a 4” fresh water pipeline and an 8” produced water pipeline. This requested pipeline crossing is due to proposed Glacier Peak Pipeline Project. The proposed pipeline project would be approximately 4.5 miles in length and would tie together production sites in the general area. The distance of the proposed crossing upon State Trust Land would be approximately 5287 feet (320.41 rods) in length X 50 feet in width for permitted area for land use license and right of way easement requested for a total acreage of 12.13 acres. The temporary land use license for construction space would total approximately 6.06 acres. The total disturbance to state trust lands would be approximately 12.13 acres. The proposed pipeline would be buried to a minimum depth of 48” and all topsoil and subsoil would be stripped and stockpiled for reclamation use. There will only be one live stream crossing upon state trust lands, this stream would be crossed utilizing HDD methods.

Tags