Glacier Peak Crude Oil Pipeline 2025-09-09

Closing Date: 10-12-2025
Glacier Peak Mainstream LLC as the proponent has applied for a 35' Right Of Way Easement in Section 16 Township 28N, Range 59E. That easement encumbers .318 acres and is 24 rods long across the state tract. The purpose of this easement is to construct and maintain a crude oil pipeline in addition to a waterline placed in the same easement across this tract.

Tags