Fulton-Ranch-Stock-Water-Pipeline-2025-06-17
Closing Date: 07-22-2025
The Proponent has requested to install an improvement consisting of a stock water pipeline and a stock tank on this tract of State Trust Land. The pipeline would tie into an existing line located on deeded property to the south and extend approximately 5200 feet through the tract. The line would be installed utilizing a static plow method. This stock water development project should create more reliable water sources for livestock and wildlife, while creating better grazing distribution within the scope of the project. Two stock tanks would be placed on the tract of trust land. The lessee is working on form 606-ST