Bell Creek 35-09X 2022-11-21

Closing Date: 10-28-2025
Denbury plans to drill a horizontal well as a producer in the tertiary CO2/Waterflood program. The TVD of this well is 4,490’ and MD is 5,002’. Objective formation is the Muddy Sandstone. Solids will be contained in metal pits and then hauled to a licensed disposal facility. Surface casing to be set at 780’ and will be cemented back to surface.

Tags