Environmental documents as required by the Montana Environmental Policy Act are posted below from across the agency. For environmental documents related to water resources, view Water Rights Application Status.
| Name | Category | Date |
|---|---|---|
|
19N2E5_Navigable River Utility ROW_Ulm 2026-08-11
Closing Date:
09-19-2026
Spectrum Pacific West, LLC has applied for a ROW easement under the Missouri River near Ulm
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Augusta 2958 24-11 5B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,713’ MD/10,390’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Bales Ranch Stock Water Pipeline 2026-08-13
Closing Date:
09-19-2026
The Proponent has requested to install an improvement consisting of a stock water pipeline and a stock tank on this tract of State Trust Land. The pipeline would tie into an existing line located on deeded property to the south and extend approximately 1400 feet through NE 1/4 of the tract. The line would be installed utilizing a static plow method. No tanks will be placed on the trust land only the pipeline which will be permitted through a land use license.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Bear Canyon Fuels Reduction Project 2026-09-16
Closing Date:
10-24-2026
Noncommercial fuels reduction on 25 acres of state land. Trees that are 8” or less in diameter would be thinned to a crown spacing of 10-15’. Trees over 8” diameter would not be cut. Other dense brush or shrubs located within the treatment units will be thinned or removed. All slash generated from this project would be hand piled and burned during appropriate, snow covered conditions.
Category:Forest Practices
|
Forest Practices | ${date} |
|
Belgrade School Utility Easement 2026-08-28
Closing Date:
10-03-2026
City of Belgrade is proposing a utility easement to provide water and sewer lines to the planned school off of Frank Road on Section 11, 1 South, 4 East, Gallatin County.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Bridger Pipeline LLC, 3 Geotech drills, Ag-597 and Ag 6231 LUL 2026-08-12
Closing Date:
09-19-2026
Bridger Pipeline LLC is applying for a Land Use License to provide access and complete 3 Geotech drills to determine soil density for proposed creek crossings that will need to be bored during pipeline installation. Each of the three locations will have a 12” hole drilled to a depth of approximately 110’ all holes will be reclaimed upon completion. Each site will take 1.5 days.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Burma Road Sediment Control Project 2026-09-01
Closing Date:
10-05-2026
The Big Hole Watershed Committee, represented by Nolan Salix, has submitted a Land Use License application to authorize the installation of sediment control features in an unnamed ephemeral coulee to mitigate erosion and sediment contribution to the Big Hole River as follows:“Install an estimated 66 One Rock Dams and 33 Sediment Control Structures with Rocks on approximately one mile of channel. These will be hand-built structures…,…8 machine-built Sediment Capture Structures with Large Woody Debris.” The proposed project encompasses 2.9 acres. See the attached exhibits for the proposed location.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Candee 35-23-3H 2026-09-01
Closing Date:
10-05-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 30,486’ MD/9,169’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Chouteau County Gravel Test Pits 2026-09-14
Closing Date:
10-24-2026
Riverside Contracting has applied for an aggregate test permit on two tracts of land in Chouteau County. They are permitted to excavate holes between 3 and 20 feet to test for gravel resources present. Proponent will be required to salvage and replace topsoil along with reseed disturbed areas.
Category:Coal, Oil, Gas, and Other Minerals
|
Coal, Oil, Gas, and Other Minerals | ${date} |
|
Chouteau County Gravel Test Pits 2026-09-17
Closing Date:
10-24-2026
Riverside Contracting has applied for a permit to test for aggregate resources on State Land in Chouteau County. Under this permit they will be allowed to dig test holes between 3 and 20 feet to look for gravel resources. the Proponent will salvage and replace topsoil and reseed disturbed areas with an approved seed mix.
Category:Coal, Oil, Gas, and Other Minerals
|
Coal, Oil, Gas, and Other Minerals | ${date} |
|
Claire 34-27-22 #1H 2026-09-01
Closing Date:
10-05-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 24,955’ MD/10,519’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Claire 34-27-22 #2H 2026-09-01
Closing Date:
10-05-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 24,835’ MD/10,523’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Claire 34-27-22 #3H 2026-09-01
Closing Date:
10-05-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 24,869’ MD/10,530’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
CPX Pipeline Corridor LUL 2026-08-20
Closing Date:
09-26-2026
The document evaluates the impacts to the natural and human environments for a proposed pipeline corridor in Richland County, MT.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Culvert installation of Middle Fork of the Poplar River 2026-08-31
Closing Date:
10-03-2026
The proponent is seeking approval to remove a damaged concrete crossing and replace with pit-run gravel and install new culvers to restore proper draining and improve reliability of existing county road crossing on the Middle Fork of the Poplar River on the county road known as "Fred's Road". The existing concrete slab crossing has deteriorated, and the culverts embedded within the structure are damaged and no longer adequately convey the water flow.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Erwin Weder Stock water Pipeline 2026-08-28
Closing Date:
10-03-2026
Erwin Weder has requested from the Department of Natural Resources and Conservation a Land Use License for a stock waste pipeline crossing the referenced tract of State owned land
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Galena 1 2026-08-21
Closing Date:
09-30-2026
Triple derrick drilling rig to drill a single lateral vertical Charles C Porosity Formation test, 6002’ MD/5954’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Gravel Testing McHessor Cr Rd 2026-08-24
Closing Date:
09-30-2026
The analysis identifies the impacts to the human and natural environments from gravel testing.
Category:Coal, Oil, Gas, and Other Minerals
|
Coal, Oil, Gas, and Other Minerals | ${date} |
|
Highwoods Overhead Transmission Line Replacement 2026-08-11
Closing Date:
09-19-2026
NorthWestern Energy is replacing an overhead transmission line. This line will now cross a corn of state land and will require and easement.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Homestead 26-35-1-11 #1H 2026-08-25
Closing Date:
09-30-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,877’ MD/10,342’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Judith Musseslshell Rural Water System Phase 3A 2026-08-31
Closing Date:
10-03-2026
This action would authorize a utility easement for the construction of a drinking water pipeline across sate land. This pipeline is part of a larger regional water project conducted by the Central Montana Regional Water Authority, with the goal of providing a higher quality and more reliable water source to communities and rural families in central Montana.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Kevin Rim Seismic Permit 2026-08-11
Closing Date:
09-19-2026
Beyond Horizon, LLC. (Henceforth referred to as the proponent) has submitted an application to conduct a seismic survey on the Montana Trust Lands. This project would utilize heavy vibration equipment and seismic receiving equipment for the purpose of mapping the subsurface below the tract for oil and gas development potential. The seismic activities will be contracted through Explor Geoscience USA. The Montana trust lands involved, are part of a much larger seismic project that is being proposed. The proponent is proposing to utilize vibroseis only for the project. Vibroseis is the process of utilizing a large truck that “thumps” the ground and sends vibrations into the subsurface which are then reflected by the subsurface and received by the receiver lines. Upon completion of the project, the receiver lines will be removed and the project area would return to its pre-existing uses. This evaluation will focus on the impacts to Montana trust lands surface ownership (project area), as there will be no impacts to the oil and gas estate from the proposed action.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Kona Bridge and Kelly Island stabilization Project 2026-09-03
Closing Date:
10-09-2026
Montana Fish, Wildlife and Parks is proposing stream stabilization work within the Navigable waterway at the Kona and Kelly island fishing access sites in Missoula County. Coldwater engineering is their authorized agent and prepared the joint application.
Kelly Island: A riprap toe would be installed within the low water mark for approximately 194 feet along the bank and would extend 6-10 feet into the stream (.04 acre).
Kona: A stone toe will be installed within the low water mark for approximately 150 feet along the bank and would extend up to 20 feet into the stream (.07 acre).
Both projects are part of a more extensive stream stabilization project. The portions outlined above are the only operations occurring within DNRC jurisdiction. All work would be completed during low flow. Both proposed areas combined would be less than an acre in size.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Land Use License - LUL 576-26_Layflat Hose 2026-09-08
Closing Date:
10-16-2026
On September 3, 2026, DNRC received an application from the Proponent, ASWS LLC dba
Hamlin Water, for the placement and operation of a temporary water pump and to lay a temporary
layflat hose for the purpose of transferring freshwater across State of Montana Land tracts. The
water would be utilized for the fracturing of a horizontal Bakken well(s).
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Luke Mountain 2 Salvage Timber Sale EA 2026-08-12
Closing Date:
10-24-2026
The Anaconda Unit of the Montana Department of Natural Resources and Conservation (DNRC) is proposing the Luke Mountain 2 Salvage. The project is located seven miles west of Avon, MT.
Category:Trust Lands - Forest Management
|
Trust Lands - Forest Management | ${date} |
|
Mount Johns Timber Sale EA 2026-08-12
Closing Date:
10-24-2026
The Kalispell Unit of the Montana Department of Natural Resources and Conservation (DNRC) is proposing the Mount Johns Timber Sale. The project is located 5 miles south of Lakeside, MT.
Category:Trust Lands - Forest Management
|
Trust Lands - Forest Management | ${date} |
|
Ollie 1 2026-09-01
Closing Date:
10-05-2026
Triple derrick drilling rig to drill a single vertical Souris River, Red River Formation test, 6500’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Pinehurst 2958 24-11 2B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,418’ MD/10,370’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Pinehurst 2958 24-11 3B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,345’ MD/10,347’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Pinehurst 2958 24-11 4B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,497’ MD/10,325’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Pinehurst 2958 24-11 5B 2026-09-08
Closing Date:
10-16-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,881’ MD/10,308’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Programmatic Environmental Draft Analysis_Non-Mechanized Mineral Exploration Land Use License 2026-09-16
Closing Date:
10-23-2026
Programmatic Environmental Analysis - Non-Mechanized Mineral Exploration on State of Montana Trust Lands: The Montana Department of Natural Resources has published a scoping notice for non-mechanized mineral exploration via a Land Use License (LUL) on State of Montana Trust Lands. The Department is seeking public comments regarding a proposed Programmatic Environmental Analysis.
The Department will be accepting comments until 5 pm, October 18, 2026. You may comment using the following link: Non-Mechanized Mineral Exploration Programmatic Review Public Comment
Category:Coal, Oil, Gas, and Other Minerals
|
Coal, Oil, Gas, and Other Minerals | ${date} |
|
Schultes 21-14 2026-08-25
Closing Date:
09-30-2026
Triple derrick drilling rig to drill a single lateral vertical Nisku Formation test, 7346’ MD/7288’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Schultes 34-11 2026-08-21
Closing Date:
09-30-2026
Triple derrick drilling rig to drill a single lateral vertical Charles C Porosity Formation test, 6079’ MD/5952’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Silve City Natural Gas Pipeline Replacement 2026-08-11
Closing Date:
09-19-2026
NorthWestern Energy is replacing a natural gas pipeline. They have applied for a temporary work area outside their easement corridor to complete this work.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Two Dog Road Shooting Range Easement 2026-08-26
Closing Date:
10-03-2026
MT DFWP seeks an 86.4-acre easement on state trust land near Logan, Montana in Gallatin County to build out a public target shooting range. This document tiers to the original Environmental Analysis prepared by DFWP posted for public comment from February 26, 2026, to March 28, 2026, and acts as a supplemental analysis to address issues specific to State Trust Lands.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Veteran Cemetery Test Dig 2026-08-20
Closing Date:
09-26-2026
The purpose of this License is to do 4 to 5 test digs, each being 2’ wide, 5’ long and 7’ deep, for possible Veteran Cemetery located within a 25 acres portion between the railroad track and S Veteran Dr. of the Northeast quarter of the Southwest quarter of Section 18, Township 30 North, Range 20 West, Flathead County Montana. The LUL will encumber the existing hayfield and will be completed after the final cut of hay has occurred. No trees will be removed, and the test holes will be immediately backfilled and re-vegetated upon completion.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Zach 27-22-15 #11H 2026-09-01
Closing Date:
10-05-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 26,214’ MD/10,458’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |