Environmental documents as required by the Montana Environmental Policy Act are posted below from across the agency. For environmental documents related to water resources, view Water Rights Application Status.
| Name | Category | Date |
|---|---|---|
|
3 Rivers Communications Easement Application 2026-10-22
Closing Date:
11-30-2026
3 Rivers Communications proposes to install a buried fiber optic telecommunications cable located on state land, referred to herein as the “Project”. The proposed easement route is located parallel to Black Leaf Cut across Road in the SE4NW4 and SW4SE4 of Section 11, T25N, R8W. The proposed easement will affect a total of 1.2736 acres and will be 10’ wide. See Exhibit A, Easement Survey Map, and Exhibit B, Project Location Map. Installation of the fiber optic cable will provide access to high-speed internet for rural Montana residents.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
APF 2026 Bison Grazing Request 2026-10-26
Closing Date:
12-05-2026
American Prairie Foundation (APF) has requested to construct, reconstruct, modify, and remove fencing and to
change the class of livestock associated with State Lease 6732 in Phillips County.
Category:Agriculture
|
Agriculture | ${date} |
|
Basking 1-22H 2026-10-13
Closing Date:
11-20-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 30,971’ MD/9,731’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Davey Jones 25-36-1-12 1H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,501’ MD/10,351’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Davey Jones 25-36-1-12 2H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,411’ MD/10,351’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Davey Jones 25-36-1-12 3H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,576’ MD/10,351’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Davey Jones 25-36-1-12 4H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,971’ MD/10,351’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Delaney 11-4 4-9 SL B1H 2026-10-13
Closing Date:
11-20-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 20,929’ MD/10,323’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Delaney Federal 31-4 4-9 B3H 2026-10-13
Closing Date:
11-20-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 20,885’ MD/10,329’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Delaney Federal 41-4 4-9 B4H 2026-10-13
Closing Date:
11-20-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 21,156’ MD/10,334’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Draggin Iron Ranch Waterline Project 2026-09-28
Closing Date:
Until Expired
Authorization of the installation and use and maintence of .39 miles of water pipeline
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Easement Application - Sun River Electric Pishkun Inlet Powerline Installation 2026-11-10
Closing Date:
12-19-2026
Sun River Electric Cooperative, Inc. proposes to construct and maintain a 69,000-volt transmission line (overhead powerline) located on state land, referred to herein as the “Project”. The proposed easement route will extend through state Section 16, Township 22N, Range 7W and continue westward through portions of Section 17, Township 22N, Range 7W and Section 13, Township 22N, Range 8W until it reaches the generation site for Greenfields Irrigation District on Pishkun Canal. The proposed route The Project will result in approximately 3.012 acres of easement area. See Exhibit A, Easement Survey Maps, and Exhibit B, Project Location Map. The Project is intended to provide the necessary electrical transmission infrastructure to support the green hydro-generation facility and improve electric grid capacity and service reliability in the Augusta, Montana area.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Eden 36-1-12 #14H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 26,572’ MD/10,224’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Goblin 1-23H 2026-10-13
Closing Date:
11-20-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 30,880’ MD/10,145’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Hodgskiss Water Pipeline Installation 2026-11-09
Closing Date:
12-19-2026
Lyle Hodgskiss proposes the installation of approximately ½ mile of buried water pipeline for livestock watering located on state land. This water pipeline will convey water from deeded land, through state land, to other deeded land. The water pipeline will serve as a reliable source for livestock use.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
LTS Telecommunication Services (USA) Inc. Kinsey Bridge fiber optic 2026-11-10
Closing Date:
12-19-2026
LTS Telecommunication Services (USA) Inc. has requested an easement from the Department of Natural Resources and Conservation for the placement of fiber optic cable over the Yellowstone River on the State-owned portion the referenced tract.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Mankind 3-10-15-22 1H 2026-10-28
Closing Date:
12-04-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,003’ MD/9,788’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Mankind 3-10-15-22 2H 2026-10-28
Closing Date:
12-04-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 30,802’ MD/9,788’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Mankind 3-10-15-22 3H 2026-10-28
Closing Date:
12-04-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 30,901’ MD/9,788’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Mankind 3-10-15-22 4H 2026-10-28
Closing Date:
12-04-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,257’ MD/9,788’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
McCone Electric Cooperative Grid Update 2026 2026-11-04
Closing Date:
12-10-2026
McCone Electric Cooperative has requested from the Department of Natural resources and Conservation an easement for an above ground electric line on the referenced tract of State owned land.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Norgaard 6-30-2H 2026-10-13
Closing Date:
11-20-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 26,005’ MD/10,333’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
North Central Montana Regional Water Authority- Segment E6 Core Line 2026-11-05
Closing Date:
12-10-2026
North Central Montana Regional Water Authority (NCMRWA) is preparing to bid on the work for the installation of a new water line near Havre. This new water line is planned as a 24-inch diameter PVC pipe. The proposed route will cross State Land at two locations. At each location NCMRWA is requesting a 50-foot-wide right-of-way easement for the installation and maintenance of this pipeline.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Reece 1 SWD 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single SWD well, 9,257’ MD/5,554’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Reece Fed 24-13-12-1 1HF 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,266’ MD/10,242’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Reece Fed 24-13-12-1 2HF 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,312’ MD/10,242’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Reece Fed 24-13-12-1 3HF 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,622’ MD/10,242’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Reece Fed 24-13-12-1 4HF 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 32,186’ MD/10,242’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Ross 1 2026-10-28
Closing Date:
12-04-2026
Triple derrick drilling rig to drill a single vertical Souris River, Red River Formation test, 6300’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Russell Guyer Stock Water Pipeline 2026-11-10
Closing Date:
12-19-2026
Russell Guyer has requested from the Department of Natural Resources and Conservation a Land Use License for a stock water pipeline across the referenced State owned tract.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Sheridan Electric Cooperative Asgard pad power ROW 2026-10-15
Closing Date:
11-27-2026
The Proponent, Sheridan Electric is proposing to install a single-phase power line extension for Asgard Xl pad in Roosevelt County. There will be 5,210 FT of underground powerline located on the State Land. The Proposed line is 1” in diameter. The width Is 30ft for a total 3.59 acre easement. The requested easement is needed to provide electrical service to an existing Asgard xl well pad. Power would be needed to utilize well pad.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Statement of Exemption NYX Well Pad 2026-10-16
Closing Date:
11-28-2026
The document is a statement of exemption from environmental review for the construction of the Nyx well pad on Montana Trust Lands.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Sun River Electric Easement Application - Jackson’s Corner East Powerline Installation 2026-11-10
Closing Date:
12-19-2026
Sun River Electric Cooperative, Inc. proposes to replace and install a new an overhead powerline (transmission line) located on state land, referred to herein as the “Project”. The proposed easement route will upgrade the existing transmission lines to maintain a 69,000-volt transmission on state tract Section 36, Township 22N, Range 5W N2NW4, N2NE4. The proposed transmission line will follow the same general route as the existing transmission line but will be moved closer to property fences and the road to mitigate disturbance to existing hay and agricultural fields. The Project will result in approximately 2.08 acres of easement area. See Exhibit A, Easement Survey Maps, and Exhibit B, Project Location Map. Installation of the overhead powerline will provide power services to the area near Augusta, Montana (local area residences and ranch properties).
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Triple H 2-11-14-23 1H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,042’ MD/9,868’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Triple H 2-11-14-23 2H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 30,857’ MD/9,868’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Triple H 2-11-14-23 3H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 30,951’ MD/9,868’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Triple H 2-11-14-23 4H 2026-11-09
Closing Date:
12-19-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,331’ MD/9,868’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Twin Bridges Water and Sewer Main Navigable River Easement 2026-10-21
Closing Date:
11-30-2026
The Town of Twin Bridges has applied for two Navigable Waters Utility Right-of-Way Easements to install a new public water main and a sewer main under a navigable portion of the Beaverhead River to expand these services in the area. The water main will encumber an area that is 86.80 feet long by 20 feet wide for 0.04 acres more or less. The sewer main will encumber an area that is 72.28 feet long by 20 feet wide for 0.03 acres more or less.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Undertaker 1-12-13-24 2H 2026-10-13
Closing Date:
11-20-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,052’ MD/9,968’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
WAPA Reactor Installation at Circle Substation 2026-11-10
Closing Date:
12-19-2026
WAPA has requested an easement from the Department of Natural Resources and Conservation for the placement of specialized voltage-control equipment on the referenced State-owned parcel
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |