Environmental documents as required by the Montana Environmental Policy Act are posted below from across the agency. For environmental documents related to water resources, view Water Rights Application Status.
Environmental documents as required by the Montana Environmental Policy Act are posted below from across the agency. For environmental documents related to water resources, view Water Rights Application Status.
| Name | Category | Date |
|---|---|---|
|
Banana Fire Salvage & Clark Hinch Timber Sale EA 12-9-2025
Closing Date:
01-15-2026
The Plains Unit of the Montana Department of Natural Resources and Conservation (DNRC) is proposing the Banana Fire Salvage and Clark Hinch timber sales. The projects are located approximately 5 and 8 air miles northeast of Plains, MT in the Clark Hinchwood area.
Category:Trust Lands - Forest Management
|
Trust Lands - Forest Management | ${date} |
|
BLM Big Hole West AP 2025-12-12
Closing Date:
01-17-2026
The Bureau of Land Management (BLM) Butte Field Office is requesting an Alternative Practice for the Big Hole West Forest Management Project (BHW), to allow for the restoration of riparian vegetation (aspen, willow, alder etc.) in coordination with timber sale operations, due to conifer shading out and out competing riparian vegetation.
Category:Forest Practices
|
Forest Practices | ${date} |
|
DRAFT EA - LUL for Offsite Storage and Recycling, AM Welles DSL Pit 2025-12-09
Closing Date:
02-18-2026
The document is a draft analysis for a proposed land use license for offsite materials and storage within a gravel pit located on State Trust Lands near Ennis, MT. The analysis evaluates the impacts of an action and a no action alternative.
Category:Coal, Oil, Gas, and Other Minerals
|
Coal, Oil, Gas, and Other Minerals | ${date} |
|
Egan Federal 3-14H 2025-12-24
Closing Date:
01-30-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 25,373’ MD/9,261’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Egan Federal 4-14H 2025-12-24
Closing Date:
01-30-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 25,100’ MD/9,256’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Hekkel 13-12-1-36 CH 2025-12-24
Closing Date:
01-30-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,108’ MD/9,937’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Hekkel 24-25-36-1 CH 2025-12-24
Closing Date:
01-30-2026
Triple derrick drilling rig to drill a single lateral horizontal Bakken Formation test, 31,096’ MD/9,937’ TVD.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Heritage Operating LUL - Surface location and SWD 2025-12-29
Closing Date:
02-06-2026
This analysis contemplates an action and no action alternative for an application for land use license that requests the ability to build a surface location and drill a salt water disposal well on state trust lands in Richland County, MT.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
Land Use License – Layflat Hose and Water Pump 2025-12-02
Closing Date:
01-08-2026
DNRC received an application from the Proponent, West Dakota Water, the placement and operation of a temporary water pump and to lay a temporary layflat hose for the purpose of transferring freshwater across State of Montana Land tracts.
Category:Oil and Gas
|
Oil and Gas | ${date} |
|
MDOT – Culvert Replacement, Simms 2025-12-16
Closing Date:
01-23-2026
The proposed project will include removing an old culvert, installing a new culvert, and temporarily using approximately 1.0 acres of state land for access and construction purposes along secondary highway 565 north of Simms, Montana.
Category:Land Leases and Land Use License
|
Land Leases and Land Use License | ${date} |
|
Riverside Gravel Testing - Loma 2025-12-02
Closing Date:
01-07-2026
This EA evaluates an action and a no action alternative related to an application to test for gravel resources on state trust land near Loma, MT.
Category:Coal, Oil, Gas, and Other Minerals
|
Coal, Oil, Gas, and Other Minerals | ${date} |
|
Spencer to Beaver Forest Management Project Final EA 12-1-2025
Closing Date:
02-07-2026
The Kalispell Unit of the Montana Department of Natural Resources and Conservation (DNRC) is proposing the Spencer to Beaver Forest Management Project. The project is located 4 miles west of Whitefish, MT.
Category:Trust Lands - Forest Management
|
Trust Lands - Forest Management | ${date} |
|
Sun River Electric Cooperative Inc. – Breaker Station / Overhead Power Line Easement 2025-12-22
Closing Date:
01-30-2026
Sun River Electric Coop has applied for an easement to install a breaker yard and overhead power line located on state land. The proposed easement location is adjacent to an existing powerline parallel on 1st Road NW. The project will encumber 1.25 acres.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Triangle Chouteau County Fiber 2025-12-15
Closing Date:
01-23-2026
The purpose of this easement is to expand the access to fiber optic broadband internet in Chouteau County. All easements are along a county road and will provide access to internet to currently unserved people.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Triangle Communication- Gildford Exchange Fiber Optic Line 2025-12-15
Closing Date:
01-23-2026
This project is extending fiber optic line to Triangle Communications Gildford Exchange Facility. New line will be installed in the existing county road right of way.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Triangle Communications - Joplin Fiber Optic Cable 2025-12-15
Closing Date:
01-23-2026
Triangle is proposing extending fiber optic telecommunication cable to their Joplin facility. This project will be installing fiber optic cable in the existing county road right of way.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |
|
Triangle Communications - Rudyard Fiber Optic Expansion 2025-12-15
Closing Date:
01-23-2026
Triangle Communications is proposing to extend fiber optic cable to their Rudyard exchange facility. All new fiber optic line will be installed in the existing county road right of way.
Category:Rights-of-Way/Easement
|
Rights-of-Way/Easement | ${date} |